Home › CAPABILITIES
The Bukit Tua Phase 2B Development Project is an offshore oil and gas development located in the Ketapang Block, East Ja...
Client: PC Ketapang II Ltd
The North Sisi Nubi and Jumelai Project aims to develop offshore gas production facilities through the installation of t...
Client: PT Pertamina Hulu Mahakam
The Sisi Nubi AOI Project is an offshore development in the Sisi Nubi field (~25 km offshore from the Mahakam Delta) aim...
Client: Pertamina Hulu Mahakam (PHM)
The West Belut Project is a development of the West Belut oil and gas field located offshore in Block B, South Natuna Se...
Client: Medco E&P Natuna Ltd
The PRRP Project involves subsea pipeline replacement and repair work within the PHE ONWJ operating area. PT Meindo Elan...
Client: PT Pertamina Hulu Energi Offshore North West Java (PHE ONWJ)
The Forel-Baronang development project is designed to build production facilities with capacity of around 10,000 BOPD an...
Showing 1 to 6 of 9 results
Ruby Tie-In Project (EPSCI-2) is part of the Ruby Field Development Project
Client: TOTAL E&P INDONESIE on behalf of MUBADALA PETROLEUM
Ruby Tie In Project (EPSCI-1) is part of the Ruby Field Development Project.
Client: Total E&P INDONESIE on behalf of MUBADALA PETROLEUM
To produce the South Mahakam Gas Condensate Field which will supply gas to the Bontang LNG Plant and to Kaltim Industria...
Client: TOTAL E & P INDONESIA
KLA flow station is one of the major gas producers in the PHE ONWJ area with a normal gas production of 40–60 MMSCFD and...
Client: PT. Pertamina Hulu Energy (PHE) ONWJ
The Kerendan Gas Field was developed for gas export to the PLN Power Plant, which was built and operated by others locat...
Client: Ophir Energy (Ex–Salamander Energy (Bangkanai) LTD)
Client PT. Pertamina Hulu Energi West Madura Offshore (PT PHE WMO) Project Name Provision of PHE-12 Topside Removal Pr...
Client: PT PERTAMINA HULU ENERGI WEST MADURA OFFSHORE (PT PHE WMO)
Showing 7 to 12 of 12 results
No posts found for this section.