Home › CAPABILITIES
The Bukit Tua Phase 2B Development Project is an offshore oil and gas development located in the Ketapang Block, East Ja...
Client: PC Ketapang II Ltd
The North Sisi Nubi and Jumelai Project aims to develop offshore gas production facilities through the installation of t...
Client: PT Pertamina Hulu Mahakam
The Sisi Nubi AOI Project is an offshore development in the Sisi Nubi field (~25 km offshore from the Mahakam Delta) aim...
Client: Pertamina Hulu Mahakam (PHM)
The West Belut Project is a development of the West Belut oil and gas field located offshore in Block B, South Natuna Se...
Client: Medco E&P Natuna Ltd
The PRRP Project involves subsea pipeline replacement and repair work within the PHE ONWJ operating area. PT Meindo Elan...
Client: PT Pertamina Hulu Energi Offshore North West Java (PHE ONWJ)
The Forel-Baronang development project is designed to build production facilities with capacity of around 10,000 BOPD an...
Showing 1 to 6 of 9 results
Peciko 7A project is part of COMPANY’s overall Peciko 7 Development program.SWP-E is an existing platform since 2004, an...
Client: TOTAL E & P INDONESIA
Tunu Field Development Phase 11 is intended to provide Low Pressure Compression Facilities, comprising of South Compress...
Peciko 7 is a further development of Peciko field aiming at producing from upper and shallow reservoirs and some infill...
Sisi Nubi Phase 2 is a further development of Sisi and Nubi fields. The objective of this project is to provide addition...
Client: Total E & P Indonesia
BCD4 is the fourth phase in the development of Betara Complex of oil and gas fields located in the Jabung Block.
Client: PETROCHINA INTERNATIONAL JABUNG LTD
Peciko 7B is a further development of Peciko field aiming at producing the shallow reservoirs and some infill wells from...
Showing 1 to 6 of 12 results
No posts found for this section.