KL Gas Lift Compressor

Project Map

KL Gas Lift Compressor

CLIENT : PT. Pertamina Hulu Energy (PHE) ONWJ

AWARD : 2014

LOCATION : Located in the Java Sea approximately 100 miles northeast of Jakarta.

Related Project

PROJECT DESCRIPTION :
KLA flow station is one of the major gas producers in the PHE ONWJ area with a normal gas production of 40–60 MMSCFD and a normal crude oil production up to 4,000 BOPD. The crude oil from KLA and KLB platforms are produced by using in-situ gas lift from gas source wells.The gas lift pressure continued to decrease and its flowrate would no longer be sufficient.To maintain the pressure and flow rate, PHE ONWJ intended to install a compressor at KLB to increase gas lift supply, as well as utilize the gas lift to recover the KLA generator fuel gas supply.Lastly, the gas lift system was installed at KLC to anticipate future gas lift injection needs to maintain KLC production.
SCOPE :
Engineering, Procurement, Construction, and Installation for KL Gas Lift Compressor in COMPANY KL Field Area (KLA, KLB, and KLC) Platforms.
SCOPE OF WORK :
- Helideck, Mezzanine Deck and Equipment Demolition, Riser Guard Installation, Deck Extension - Two Train of Compressors, Gas Engine Generator, Fuel Gas System, Seal Gas Packages System - Cooler Packages including all its accessories, Lube Oil Packages, Flare Boom Installation, and Flare System (including all accessories: Flare Tip and Front Flame Generator) - Instrument Air Compressor System, Pig Receiver, Pig Launcher, New Control Room (including HVAC System and Control Room Modification) - Piperacks, Electrical/Instrument, PCS, ESD, F&G System, MCC Installation, and Pipe Spool - Safety Equipment Installation