CLIENT : PC Ketapang II Ltd
AWARD : 01 October 2019
LOCATION : Located in the East Java Sea, Ketapang Block, East Java Basin, approximately 100 km offshore Surabaya, north of Madura Island, Indonesia
Related Project
PROJECT DESCRIPTION :
The Bukit Tua Phase 2B Development Project is an offshore oil and gas development located in the Ketapang Block, East Java Basin. The field contains hydrocarbon reserves of oil with significant associated gas. The project is situated in the East Java Sea, approximately 100 km from Surabaya, north of Madura Island, and is tied back to existing facilities BTJT-A Wellhead Platform and BT-FPSO located approximately 3.6 km northwest of the new field.
SCOPE :
Engineering, Procurement, Construction, Installation and Commissioning (EPCIC) of: BTJT-B Wellhead Platform Infield Pipelines Host Tie-In Modification FPSO and ORF Modifications Pre-Commissioning and Commissioning.
SCOPE OF WORK :
Engineering, Procurement, Construction, Installation, Pre-Commissioning, and Commissioning (EPCIC) of BTJT-B 4-Leg Wellhead Platform, including jacket and topside fabrication, offshore transportation and installation, well tie-in works, infield pipelines, host platform modification, FPSO and ORF modification, and integrated commissioning for Bukit Tua Phase 2B Development Project.