South Mahakam Phase 3 (SMK3) Project
South Mahakam Phase 3 (SMK3) Project
CLIENT : TOTAL E & P INDONESIA
AWARD : 2013
LOCATION : Located offshore, approximately 35 km to the southeast of Balikpapan and 58 km south of the nearest Peciko platform 'SWP-F' (Peciko 5b).
Related Project
PROJECT DESCRIPTION :
To produce the South Mahakam Gas Condensate Field which will supply gas to the Bontang LNG Plant and to Kaltim Industrial Estate.
SCOPE :
Engineering, Procurement, Construction, Hook-Up, Commissioning, and Start-Up.
SCOPE OF WORK :
- Jempang Metulang (JM1) Platform – Tripod Jacket, Topside 6 Slots with 7 Wells (associated equipment includes Pressure Vessels, Piping, Multiphase Measurement, Control Valves, Field Instruments, and Integrated Control and Safety System). - MD1 Tie-In Pig Receiver, Pre-Fabricated Tie-In Spools, Valves, Gas Detectors, ICSS Modification. - Onshore (Senipah) Control System Modification for New Platform.