Kerendan Gas Facilities Project
Kerendan Gas Facilities Project
CLIENT : Ophir Energy (Ex–Salamander Energy (Bangkanai) LTD)
AWARD : 2012
LOCATION : Kabupaten Barito Utara, Central Kalimantan — approximately 200 km from Balikpapan and 330 km from Banjarmasin.
Related Project
PROJECT DESCRIPTION :
The Kerendan Gas Field was developed for gas export to the PLN Power Plant, which was built and operated by others located near the KGFP site. The project was designed for production rates of up to 20 MMSCFD, with an anticipated field life of 20 years.
SCOPE :
Engineering, Procurement, Construction, Installation, Pre-Commissioning, and Commissioning Assistance.
SCOPE OF WORK :
- Construction of Kerendan Gas Processing Facilities (KGPF), including camp and supporting buildings. - Installation of flowlines from Wellheads K-04, K-06, K-07, and K-08 to the Manifold in the Wellhead Cluster Pad. - Installation of 8" Gathering Pipeline and 4" Water Re-Injection Pipeline (up to 3 km). - Installation of 8" Sales Gas Pipeline from KGPF to PLN Power Plant (4 km), including tie-in and metering station. - Installation of Condensate Handling System. - Installation of Produced Water Handling System.