Forel Baronang Project
Forel Baronang Project
CLIENT : Medco E&P Natuna Ltd
AWARD : -
LOCATION : Baronang and Forel fields, Natuna Block area, Indonesia
Related Project
PROJECT DESCRIPTION :
The Forel-Baronang development project is designed to build production facilities with capacity of around 10,000 BOPD and 43 MMSCFD (gas lift/gas injection/own-use) under the Forel and Baronang fields. The project includes 2 wellhead platforms, approximately 17 km of 8-inch subsea pipeline, and an FPSO (Floating Production, Storage & Offloading) unit, scheduled to be on-stream in Q4 2023.
SCOPE :
Engineering, Procurement, Construction, Installation (EPCI)
SCOPE OF WORK :
• 2 well-head platforms • ~17 km of 8-inch subsea pipeline • FPSO unit for oil/gas production, storage & offloading