South Mahakam Phase 3
Client | TOTAL E & P INDONESIA |
---|---|
Project Name | South Mahakam Phase 3 (SMK3) Project |
Project Description |
To produce the South Mahakam Gas Condensate Field which will supply to the Bontang LNG PLant and to Kaltim Industrial Estate |
Contract Award | April 2013 |
Scope |
Engineering, Procurement, Construction, Hook-Up, Commissioning, and Start-up |
Project Location | Located offshore, approximately 35 km to the South-East of Balikpapan and 58 km South of the nearest Peciko platform 'SWP-F' (Peciko 5b) |
Facilities |
Jempang Metulang (JM1) Platform - Tripod Jacket, Topside 6 Slots with 7 Wells (Associated equipment like Pressure Vessels, Piping, Multiphase Measurement, Control Valves, Field Instruments, and Integrated Control and Safety System) MD1 Tie-In Pig Receiver, Pre-Fabricated Tie-In Spools, Valves, Gas Detectors, ICSS Modification Onshore (Senipah) Control System Modification for New Platform |
Water depth | Ranges between 45 m to 60 m |
Project Completion | April 2015 |