Ruby Tie In
Client | TOTAL E&P INDONESIE on behalf of MUBADALA PETROLEUM |
---|---|
Project Name | Ruby Tie In Project (EPSCI-2) |
Project Description | Ruby Tie-In Project (EPSCI-2) is part of the Ruby Field Development Project |
Contract Award | December 2011 |
Scope | Continuation of Installation of Onshore Pipeline, Fabrication, Erection and Installation, Modification on Exisiting System, Tie In and System Integration to Exisiting Facilities |
Project Location | Senipah Facility |
Scope of Work |
Slug Catcher Finger Type Including all its Accessories Free Water Knock Out Drum Including all its Accessories Gas Fiscal Metering Packages System Condensate Fiscal Metering Packages System Including 2 Units Pumps to Deliver the Liquis from Scrubber/Deliquidiser to Condensate Fiscal Metering Water Metering Pig Receiver Oily Water Pumps Instrument Air Package Systems Chemical (Methanol) Injection System Pressure Vessels Open Drain Systems Closed Drain Systems Fire Water System Flare System Fuel Gas System Safety and Fire Fighting Equipment and Fire and Gas Detectors Instrumentaion Control System Safety Shut Down System Electrical System Telecommunication System Corrosion and Coating System All other equipment necesary for the Plant Temporary facilities to accomodate COMPANY and CONTRACTOR management teams on SITE |
Project Completion | October 2013 |