Kerendan Gas Processing Facilities
Client | Ophir Energy (Ex- Salamander Energy (Bangkanai) LTD) |
---|---|
Project Name | Kerendan Gas Facilities Project (KGFP) |
Project Description | The development of the Kerendan Gas Field is for export to the PLN power plant which will be built and operated by Others which will be located nearby the KGFP, with production rates of up to 20 MMSCFD for anticiapted field life of 20 years. |
Contract Award | May 2012 |
Scope | Engineering, Procurement, Construction, Installaton, Pre-commissioning, and Commissioning Assistance |
Project Location | Located at Kabupaten Barito Utara, Central Kalimantan, about 200 km from Balikpapan and 330 km from Banjarmasin |
Scope of Work |
Kerendan Gas Processing Facilities (KGPF) including camp and building facilities Flowlines from Wellheads K-04, K-06, K-07, and K-08 to Manifold in the Wellhead Cluster Pad 8" Gathering Pipeline and 4" Water Re-injection Pipeline (as long as 3km) 8" Sales Gas Pipeline form KGPF to PLN (4km), Tie-in, and Metering Station at PLN Power Plant Area Condensate Handling System Produced Water Handling System |
Project Completion | December 2015 |