Peciko 7A

Client TOTAL E & P INDONESIA
Project Name Peciko Phase 7A
Project Description

Peciko 7A project is part of COMPANY overall Peciko 7 Development program.

SWP-E is existing platform since 2004 and COMPANY has the program to utilize this platform to operate 3 additional wells. In order to achieve this purpose, COMPANY need to add some necessary extension structures and new anodes as a part of the master plan, and they need to be installed before the additional conductor pipes are installed. The additional new structure to be connected directly to the existing Peciko SWP-E platform.

Contract Award February 2009
Scope Engineering, Procurement, Construction, Hook-Up, Pre-Commissioning & Commissioning Asistance
Project Location Peciko Field, Mahakam Delta, East Kalimantan on SWP-E platform
Scope of Work

Fabrication of three new platform extension (lower deck, mezzanine deck & upper deck)

Fabrication of additional supports for the new platform extension

Fabrication of conductor guide

Fabrication of new anodes

Load out & sea-fastening for CP guide, new platform extension and new anodes

Site works such as Site Survey for surface, Site preparation, underwater survey, Clean up marine growth, cut-off existing anode, Installation of Conductor Guide, Installation of New Platform Extension, Installations of new anodes for cathodic protection, Demolition of Existing Structure, and Touch-up Painting

 

Water Depth 30 to 50 m
Project Completion July 2009