Peciko Phase 7 – EPC1

PROJECT DESCRIPTION :
Peciko 7 is a further development of Peciko field aiming at producing from upper and shallow reservoirs and some infill wells from TUNU Main Zone to bring in additional production of 83 MMSCFD in 2010 and up to 156 MMSCFD in 2011, with an incremental of 139 BCF (2017) via 23 development wells.Some of the existing wellhead slots and wellhead flowlines on MWP-A, MWP-B, and SWP-E platforms shall be modified from single wells to become commingled wells, and additional splitter wellheads will be drilled.
SCOPE :
Engineering, Procurement, Construction, Hook-Up, Pre-Commissioning & Commissioning Assistance
SCOPE OF WORK :
• CP protection frame and deck extension installations• Air diving works• Fabrication and installation of production, test, and vent headers• Fabrication and installation of fuel gas filters• Fabrication and installation of cathodic protection system• Fabrication and installation of flow lines• Fabrication and installation of utilities lines• Electrical and instrumentation works• Pre-commissioning works