GG New Field Development Project
GG New Field Development Project
CLIENT : PT. Pertamina Hulu Energy (PHE) ONWJ
AWARD : 2013
LOCATION : Located in the northwest section of the Java Sea, approximately 18.7 miles offshore North Cirebon, West Java
Related Project
PROJECT DESCRIPTION :
The GG Field Development Project aims to drain hydrocarbons from the reservoir within the Baturaja Formation, achieving a gas production rate of 31 MMSCFD and 155 BCPD.
SCOPE :
Engineering, Procurement, Fabrication, Transport & Installation, Construction, Pre-Commissioning, Commissioning, and Start-Up Assistance
SCOPE OF WORK :
- 4-Leg Unmanned Production (GGA NUI) Platform with jackets and topside, consisting of Main Deck & Mezzanine Deck to place Christmas Tree, Solar Panels Array, DC Panel Package, and Helideck. - 12” × 35 KM 3-phase Subsea Pipeline from GGA NUI Platform including Shore Approach. - Onshore Processing Facilities (OPF). - Onshore Export Pipelines.